SCHDEULE OF RATE's
INDEX S.No. Description 1. General notes and conditions 2. Chapter 1- Construction of ordinary tubewell 3. Chapter 2- Construction of gravel pack tubewell 4. Chapter 3- Installation of handpump, construction of platform, drain and soakage pit 5. Chapter 4- Development, yield test and disinfection of tubewell 6. Chapter 5- Resistivity survey 7. Annexure 1- Issue rates 8. Annexure 2- Strata chart proforma 9. Annexure 3- Resistivity survey report proforma 10. Annexure 4- Yield test report proforma 11. Annexure 5- Drawing of hand pump platform 12. Annexure 6- Drawing of soakage pit 13. Annexure 7- Drawing of 125/115 mm ordinary tubewell 14. Annexure 8- Drawing of 150/125/115 mm tubewell 15. Annexure 9- Drawing of 150 mm ordinary tubewell 16. Annexure 10- Drawing of gravel pack tubewell << Previous
INDEX